From your signature to your keys.

We handle
One team holds the entire chain — so you hold nothing but the keys.

  • Written scope & BOQ
  • Dated stage-wise plan
  • Approvals in-house
  • 0Years
    Building
  • 0Projects
    Delivered
  • 0In-house
    Approvals
  • 0Point of
    Contact
Scroll — the build begins
The Promise

Most people who build a house end up managing eleven different vendors. You will manage one.

The architect blames the contractor. The contractor blames the municipal office. The interior team arrives to find the electrical points in the wrong wall. Six months become eighteen.

Adinath Infra Solutions was built to end that. We take the file the day you sign and return it the day you turn the key — approvals, drawings, structure, finishes, furniture, snagging, handover. Single contract. Single accountability. Single number to call.

See the full chain we hold
Watch It Get Built

Scroll, and your
house rises from
the ground.

Not a slideshow. A live 3D build — plot, footing, columns, slab, brick by brick, roof, plaster, then the furniture goes in and the lights come on.

01

Plot & Survey

Boundary marked, levels taken, plot feasibility cleared.

  1. Plot
  2. Footing
  3. Columns
  4. Slab
  5. Masonry
  6. Roof
  7. Finishes
  8. Handover

Every stage above is a stage we hold in writing — with photographs sent to your phone the week it happens.

Start my build
How It Works

From first call to keys,
in six gated phases.

Every phase closes with your written sign-off and an in-house QA check before the next one starts.

  1. Stop 012–3 days

    Consultation & Site Visit

    Signed design brief

  2. Stop 023–6 weeks

    Approvals & Sanction

    Plan sanctioned in your name

  3. Stop 031–2 weeks

    Design & Photoreal 3D

    Approved renders

  4. Stop 04~1 week

    Drawings & Itemised BOQ

    BOQ + drawings signed

  5. Stop 05stage-linked

    Execution & Site Works

    Weekly photo & cost report

  6. Stop 062–3 days

    Snagging & Handover

    Keys + warranty pack

Each phase gated by your sign-off + in-house QA.

Standard schedule 10% · 50% · 40% — milestone-linked, nothing paid ahead of work done.

Capabilities

Everything a
property needs.
Nothing outsourced.

Six divisions, one office, one invoice, one person answerable to you.

01

Architecture & Building Planning

Residential, commercial and institutional. Concept through to sanctioned working drawings and structural design.

02

Government Approvals & Permissions

Plan sanction, layout, diversion, NOCs, completion and occupancy. Liaison handled entirely in-house.

03

Turnkey Construction

Civil, RCC, masonry, waterproofing and finishing with cube-tested material and weekly cost reporting.

04

Residential Interiors

Flats, villas and independent homes. Modular kitchens, wardrobes, ceilings, lighting and final styling.

05

Commercial Interiors

Offices, showrooms, clinics, retail and hospitality — planned around footfall, staff flow and brand.

06

Project Management & Supervision

Dated schedules, vendor coordination, quality checks and a weekly report you can actually read.

Not sure which of these you need?

Tell us about your property — we'll map it free
Walk The Finished Flat

A complete 3BHK,
room by room.

Not a mood board — a full 1,500 sq.ft. plan you can walk. Living and dining, modular kitchen, three bedrooms, bathroom and balcony, each laid out and furnished the way we actually hand them over. Scroll to move through the flat.

01

3BHK · 1,500 sq.ft.

The full plan — living, dining, kitchen, three bedrooms, bath and balcony.

  1. Plan
  2. Living
  3. Kitchen
  4. Master
  5. Bed 2
  6. Bed 3
  7. Bath
  8. Balcony
  9. Keys
  • 1,500Sq.ft. carpet area planned
  • 3Bedrooms, each with fitted storage
  • 60–90Days from bare shell to keys
Plan my interiors
Transformation

Drag the line.
Watch 84 days pass.

3BHK apartment · Arera Colony, Bhopal · Handed over in 84 days

Finished interior after handover
Bare shell before work began
  • 84Days from bare shell to key handover
  • 1,450Sq.ft. of carpet area fully fitted out
  • 0Change-order surprises on final bill
  • 100%Snag list closed before handover
0/5

Average client rating across completed projects

Collected on handover · verified clients
  • 0Projects delivered
  • 0Sq.ft. designed & built
  • 0On committed date
  • 0Years in Bhopal
On The Ground

Renders are easy.
Reinforcement is not.

Real sites. Real crews. Real steel. Photographed during execution, not after.

“I have never handed over a project I would not live in myself. That is the whole standard.”

Vikas Jain, Founder of Adinath Infra Solutions Vikas JainFounder · Adinath Infra Solutions
Why Adinath

Authority is not
claimed. It is
documented.

01

Eight years, one owner, one standard

Founded and still personally led by Vikas Jain — Interior Designer and Building Planning professional. The person who designs your project is the person answerable for it.

02

Approvals handled in-house

Building plan sanction, layout, diversion, DPR and completion documentation are executed by our own team — for private clients and government project tenders alike.

03

Verified professional network

Active member of BNI Vision, Bhopal — registered under Interior Design (Commercial). Referral-audited relationships, not anonymous contracting.

04

Written scope, written schedule

Dated stage-wise plan, itemised BOQ, and a change-order policy in writing before the first bag of cement arrives. No verbal budgets.

05

Weekly proof of progress

Photographs, material bills and completion percentage delivered every week — whether you are in Bhopal, Bengaluru or Boston.

06

One year after handover

We return at 30, 90 and 365 days. Warranty folder, service contacts and a walkthrough. Handover is a milestone, not an exit.

0Years in business
0Projects delivered
0Sq.ft. designed & built
0Delivered on committed date
Client Voices

The only review
that matters is the
second project.

We were in Pune while our Bhopal flat was being done. Every Saturday we got photos and a bill summary. We walked in after four months and there was genuinely nothing left to fix.

Rohit & Anjali Mehta3BHK Interiors · Arera Colony

The sanction was stuck for months with our earlier consultant. Adinath took the file, corrected the drawings and got it cleared. Then they built it too. That is the whole point.

Dr. S. KhandelwalClinic + Residence · Kolar Road

Our showroom had to open before Diwali. They gave a dated plan, held it, and handed over two days early. We opened on schedule. Second store is already with them.

Manish AgrawalRetail Showroom · MP Nagar

What I valued most was the honesty about budget. They told us upfront what was not possible in our number instead of discovering it halfway. Rare in this industry.

Priya SharmaVilla Interiors · Bawadiya Kalan

One number for architecture, approvals, civil and interiors. I did not make a single trip to a municipal office. For a working professional that alone is worth it.

Ankit JainIndependent House · Shahpura
Before You Call

The four questions
everyone asks.

Still unclear? Talk to our team — the consultation is free and there is no follow-up pressure.

Call +91 88397 68740

Yes — and this is a core reason clients choose us. Building plan sanction, layout approval, diversion, NOCs, DPR preparation, completion and occupancy documentation are all handled by our own team. You never stand in a municipal queue.

Absolutely. Most clients take the full signature-to-keys package because it removes coordination risk, but architecture-only, approvals-only and interiors-only engagements are all available with the same written scope and schedule.

A 3BHK interior fit-out typically runs 60–90 days. A ground-up residential build runs 10–16 months including approvals. Commercial fit-outs are usually 45–75 days. You receive a dated, stage-wise schedule before work begins — and we report against it weekly.

You get an itemised BOQ with quantities, brands and rates before work starts. Payments are stage-linked to completed milestones. Any change is issued as a written change-order with cost and time impact, approved by you before execution. No verbal budgets, no end-of-project surprises.

Bhopal and across Madhya Pradesh, from our office at 306, E-2, Arera Colony. Projects outside MP are taken on case by case depending on scale and duration.

Start Here

Tell us about your property.

In one 30-minute conversation you will get a realistic budget band, a realistic timeline, and the exact approval path your plot needs. Free. No obligation. No follow-up pressure.

  • Response within one working day
  • Site visit at your convenience
  • Written scope before any payment

Request Free Consultation